Industries

Four sectors with one thing in common: the mechanical systems are not a background utility. If they drift or stop, so does the business.

Data centres

Rack densities are climbing faster than most cooling plant was designed for, while operators are held to tighter targets on energy, water and, increasingly, what happens to the waste heat. All of it has to be solved without putting uptime at risk.

What operators are dealing with

  • Higher-density and liquid-cooled racks in halls built for air
  • Energy and water efficiency targets
  • Pressure to reuse waste heat
  • Concurrent maintainability and fault tolerance

How Frank EcoTech helps

  • Cooling concepts for new halls and retrofits
  • Reviews of proposed or existing designs
  • Efficiency and heat reuse studies

Electronics manufacturing and cleanrooms

Yield depends on air that stays within narrow limits of temperature, humidity, pressure and cleanliness. Holding those limits takes very high air volumes, which makes HVAC one of the largest energy users on site and one of the best places to look for savings.

What manufacturers are dealing with

  • Tight temperature and humidity tolerances
  • High air change rates and fan energy
  • Process cooling water and process exhaust
  • Changes to production lines inside live facilities

How Frank EcoTech helps

  • HVAC design for cleanrooms and controlled environments
  • Process cooling design
  • Energy reviews that respect process limits

Manufacturing and industrial

Industrial sites combine large ventilated volumes, process heating and cooling, and plant that has often been extended many times over decades. Heat is frequently rejected in one part of the site while being paid for in another.

What sites are dealing with

  • Rising energy cost and carbon targets
  • Ageing boilers, chillers and air handling plant
  • Heat wasted from processes and compressors
  • Ventilation for heat, fumes and worker comfort

How Frank EcoTech helps

  • Industrial ventilation and process cooling design
  • Heat recovery and heat pump feasibility
  • Plant replacement strategies

Commercial real estate

Owners and developers face energy performance requirements that keep tightening, tenants who expect comfort and good air quality, and central plant that is reaching the end of its life. The decisions made at replacement time set the building's running cost for the next twenty years.

What owners are dealing with

  • Energy performance and reporting requirements
  • Moving heating away from fossil fuels
  • End-of-life central plant
  • Comfort complaints and high running costs

How Frank EcoTech helps

  • HVAC design for new build and refurbishment
  • Energy reviews and decarbonisation options
  • Plant replacement studies

Your sector isn't listed? If the problem is heating, cooling, ventilation or the energy they use, it is probably within scope.